top of page
PATENT PENDING
Michael Long
Director of Operations
Principle Construction Corp
"We needed to begin the interior floor slab pour but the soil's condition was too saturated with moisture. Turbo Dry allowed us to quickly dry sections and pour concrete uninterrupted. It was both fast and cost-effective."
bottom of page