top of page
THIS IS WHAT OUR CLIENTS HAVE TO SAY:
Michael Long
Director of Operations
Principle Construction Corp
"We needed to begin the interior floor slab pour but the soil's condition was too saturated with moisture. Turbo Dry allowed us to quickly dry sections and pour concrete uninterrupted. It was both fast and cost-effective."
Steve Golumbeck
Vice President
Peak Construction Corp.
"Based on the colder-than-average winter, over two feet of frost had settled into the building pad of a warehouse we were completing. Using Turbo Dry allowed us to dry out the pad and complete the space for the tenant's move-in on time."
bottom of page